On-site Investigation and Diagnostics

  • Perform preliminary checks and testing before escalation

    • Power-cycle the NTD and CPE (router/firewall).

    • Replace or reseat cables between the wall NTD and CPE.

    • Test from an isolated setup (direct connection to NTD) to confirm if the fault persists.

  • Document findings from in-house checks

    • Record any observed lights/status on the NTD.

    • Save screenshots of speed test results, traceroutes, or diagnostics.

    • Note the time, duration, and pattern of any outages or slowdowns.

  • Provide timely site access

    • Ensure someone authorised is available to grant entry to the premises during the scheduled visit.

    • If applicable, arrange security clearance or escort for visiting technicians.

  • Be present (or arrange representation) during technician visits

    • Assist the technician in locating equipment, wall sockets, and cabling.

    • Provide any requested information about the building wiring or network setup.

  • Avoid delays and no-fault charges

    • Be ready at the agreed time to avoid missed appointments.

    • Ensure internal wiring and devices are accessible and powered on before the visit.

Last updated